If two (or more) scaffolds are linked lengthwise, people can move from one scaffold to the other thanks to the passageway frame.
Features
- Saves time by eliminating need to climb up or down between scaffolding
- Passageway can be either on the front side or the street side
- Meets EN1004 (class 3)
- [14708] suitable for the narrow mobile scaffolding
- [14709] suitable for the wide mobile scaffolding
Your selection
Description | From price |
---|---|
Passage frame, narrow
Code 14708
View details
|
per week € 21,78 including 21% VAT |
passage dimensions (cm) | 62,7 x 163 |
width (cm) | 0,75 |
Passage frame, wide
Code 14709
View details
|
per week € 21,78 including 21% VAT |
passage dimensions (cm) | 62,7 x 163 |
width (cm) | 135 |
All prices include 21% VAT and exclude costs for maintenance, fuel, oil, wear and tear, transport, cleaning, accessories and various attachments, any environmental taxes and surcharges for damage waiver and fire/theft schemes.
POA = price on application
Similar products

Chimney scaffolding
Code 11951
per week

Weather cover
Code 14703
per week

Walkways
per week

Passage frame, floor level
Code 14702
per week

Cantilever scaffolding
Code 11974
per week